Conveyor belt splices are the weakest link in a conveyor system; splice quality directly impacts overall performance and service life. Backed by over 20 years of technical expertise, Baoding Zhongbo Mining & Industrial Machinery Co., Ltd. has established a comprehensive set of splice process specifications and a robust quality control system.
## I. Hot Vulcanization Splicing Process
### 1. Process Principle
Hot vulcanization splicing uses heat and pressure to trigger a vulcanization reaction in the rubber compound at the splice area, bonding it seamlessly with the main belt body to achieve strength close to that of the original belt.
### 2. Process Flow
- **Splice Design:** Determine the number of steps and overlap length based on belt specifications.
- **Head Stripping:** Strip canvas plies layer by layer, retaining the core ply.
- **Cleaning & Grinding:** Remove surface impurities to increase bonding area.
- **Gluing & Lamination:** Apply cement evenly and laminate layers sequentially.
- **Vulcanization:** Maintain temperature at 145±5℃, pressure at 1.5-2.0 MPa; duration depends on thickness.
- **Cooling & Trimming:** Allow natural cooling, then trim flash edges.
### 3. Key Control Points
- **Temperature:** Deviation must not exceed ±5℃.
- **Pressure:** Ensure uniform force distribution across the splice.
- **Time:** Insufficient or excessive curing time compromises quality.
- **Environment:** Prevent dust and moisture contamination of the splice surface.
## II. Cold Adhesive Splicing Process
### 1. Application Scope
Suitable for locations where vulcanization equipment cannot be used, such as underground mines or high-altitude areas.
### 2. Process Highlights
- **Surface Preparation:** Thoroughly clean and grind the splice surfaces.
- **Gluing Technique:** Apply multiple thin coats; allow each layer to dry completely before applying the next.
- **Lamination & Pressing:** Eliminate air bubbles to ensure full contact.
- **Curing Time:** Cure for more than 24 hours at ambient temperature.
### 3. Precautions
- **Temperature:** Implement heating measures if ambient temperature is below 10℃.
- **Humidity:** Avoid construction if humidity exceeds 80%.
- **Handling:** Prevent stress and vibration during the curing period.
## III. Splice Quality Inspection
### 1. Visual Inspection
- **Flatness:** No significant unevenness.
- **Edge Integrity:** No missing glue or overflow.
- **Surface Quality:** Free from bubbles, cracks, or debris.
### 2. Strength Testing
- **Tensile Test:** Splice strength must be no less than 85% of the original belt.
- **Peel Test:** Inter-ply adhesion must meet standard requirements.
### 3. Non-Destructive Testing (NDT)
- **X-Ray Inspection:** Check for internal voids or delamination.
- **Ultrasonic Inspection:** Verify uniform bond quality.
## IV. Common Issues & Solutions
### 1. Splice Cracking
**Cause:** Insufficient vulcanization temperature, low pressure, or short duration.
**Solution:** Strictly adhere to process parameters and enhance process monitoring.
### 2. Splice Deformation
**Cause:** Uneven heating or unbalanced pressure.
**Solution:** Optimize the vulcanizing plate structure and calibrate equipment regularly.
### 3. Poor Adhesion
**Cause:** Incomplete surface preparation or inferior cement quality.
**Solution:** Standardize operating procedures and select high-quality cement.
Baoding Zhongbo provides professional splice technical services and training to ensure customers master correct splicing techniques, extending conveyor belt service life.
Jointing processHot vulcanizationQuality Control